Pedestrian Bridge Over Arlington Blvd. Temporarily Closed for Repairs
Published on December 08, 2022
Engineers are closing the pedestrian bridge connecting North Fairfax Drive to Fort Myer Drive over Arlington Boulevard, effective immediately, as a result of a bridge inspection today, Thursday, December 8, out of an abundance of caution.
Pedestrian access over Arlington Boulevard will be maintained on the Rhodes Street bridge to the west and North Meade Street to the east.
The restrictions will stay in place until further notice. The Arlington Boulevard multi-use trail will remain open on the north side of the bridge.
Crews had been conducting maintenance work on the bridge’s surface. An inspection revealed deterioration of the concrete in some sections of the bridge. The bridge will be temporarily closed while crews work on these repairs.
