S. Lynn Street - Shared Streets Pilot Project As part of the Neighborhood Complete Streets Shared Streets pilot, the project considers improvements along South Lynn Street from 16th Street South to 20th Street South in the Arlington Ridge neighborhood.
N. Wakefield Street - Shared Streets Pilot Project As part of the Neighborhood Complete Streets, Shared Streets pilot, the project considers improvements along North Wakefield Street from Wilson Boulevard to North Carlin Springs Road in the Bluemont neighborhood.
12th Street S. - Shared Streets Pilot Project As part of the Neighborhood Complete Streets Shared Streets pilot, the project considers improvements along 12th Street from South Glebe Road and South Walter Reed Drive in the Douglas Park neighborhood just south of Columbia Pike.
Development Services Fee Analysis The goal of the Development Services Fee Analysis is to review our current fee structure and to provide recommendations for a new fee structure to capture costs more accurately.
Arl Blvd Trail - Granada St. to Edison St. The goal of this project is to improve the north-side segment of the Arlington Boulevard Trail between N. Granada Street to N. Edison Street.
Pershing Drive Complete Street Improvements This project seeks to improve safety and accessibility for all users throughout the Barton-Piedmont corridor, within the constraints of a narrow/limited right-of-way. It further seeks to consolidate bus stops to improve bus service efficiency and improve bus stops to better support riders and meet requirements of the Americans with Disabilities Act (ADA).
Resurfacing Projects for Complete Streets - 2021 Season One of the ways Arlington County delivers on the Master Transportation Plan Complete Streets policy is to review the annual list of streets up for routine maintenance and identify those that might benefit from improvements to provide safe access for all people using the street.
Vacation Lane & Lorcom Lane Intersection Improvements Project This project will review travel and safety operations at the intersection of Lorcom Lane and Vacation Lane with the goal of improving safety for people walking, biking and driving.
East Falls Church Metro Station Bus Bay Expansion This project will expand the number of bus bays at the East Falls Church Metro Station from four to seven, to reduce bus operations conflicts and provide new shelters and increase pedestrian accessibility for local and regional bus routes at the Metrorail station.
Arlington View Connector Trail (ANCC Trail) The project will provide a new trail connection between 13th Road South at the Hoffman-Boston Elementary School campus and the Arlington Ridge neighborhood by Memorial Drive next to the Army Navy Country Club entrance gate. The two neighborhoods are currently separated by I-395/Shirley Memorial Highway.