Core of Rosslyn Transportation Study (2019)
Ballston Station Multimodal Study (2013)
Meade Street Bridge Design Study (2011)
Clarendon Multimodal Transportation Study (2010)
Crystal City to Reagan National Airport Multimodal Connection (CC2DCA) (ongoing)
Crystal City Bike Network (2022)
22202 Transportation and Planning Data (2020)
Crystal City Multimodal Transportation Study(2010)
Columbia Pike Transit Corridor Study(2016)
Columbia Pike Transit Initiative (2014)
Columbia Pike Multimodal Transportation Study(2012)
Lee Highway Corridor Analysis Multimodal Needs Assessment (2015)
North Harrison Street Comparative Analysis (2007)
Custis Trail Needs Assessment & Priority Improvements Study (2024)
Arlington Boulevard Trail Feasibility Study: George Mason Drive to Jackson Street (2023)
South George Mason Drive Multimodal Transportation Study (2023)
W&OD Trail – East Falls Church Connection Alternatives Analysis (2020)
South Carlin Springs Road Safety Study (2018)
Virginia Department of Transportation (VDOT)
VTrans – Virginia’s Transportation Plan
Route 1 Multimodal Improvements Study
Washington Metropolitan Area Transit Authority Plans & Studies
Better Bus Network Redesign
Virginia Passenger Rail Authority Plans & Studies
Long Bridge Planning and Project