Bluemont Park Bridges Replacement Project

Location

329 N Manchester St, Arlington, VA   View Map

Status

In Design

1.jpg

About the Project

Project Goals: 

Repair and/or Replace:

  • Low-water ford
  • Pedestrian bridge
  • Culvert bridge
  • Make pedestrian bridge ADA compliant

Design and construct the repair and/or replacement of the existing low-water ford, pedestrian bridge and culvert bridge structure at Bluemont Park near the playground, picnic shelter and restroom building. These structures have been identified for repair/replacement by a bridge inspection study. This project is part of the Trail and Bridge Modernization Program detailed in the FY 2023 - FY2032 Capital Improvement Plan. A goal for the project is to make the pedestrian bridge compliant with the Americans with Disabilities Act. No additional amenities are planned for this project. 

About the Process

Click the drop downs below to explore the details and resources throughout the project process. A graphic timeline of the process can be found here(JPG, 191KB).

Winter 2023/2024 - Final Draft Design Feedback

Level of Engagement: Consult

The project team shared the final draft design for final comments from the community.

Spring 2024 (Projected) - Construction Begins

Level of Engagement- Communicate

Fall 2024 (Projected) - Construction Ends

Level of Engagement- Communicate

 

Funding

Trail and Bridge Modernization Program