Washington Boulevard Repave at Westover (N McKinley to N Longfellow)
Location
Washington Boulevard (VA 237), Arlington, VA 22201 View Map
38.8853439,-77.11721350000001
Washington Boulevard (VA 237) ,
Arlington, VA 22201
Washington Boulevard (VA 237) ,
Arlington, VA 22201
Washington Boulevard Repave at Westover (N McKinley to N Longfellow)
StatusComplete
Location
Washington Boulevard between North McKinley Road and North Frederick Street, with a one block segment between North McKinley Road and North Longfellow Street where brick pavers must be removed.
This restriping and remarking project was completed by the Virginia Department of Transportation during the 2019 repaving season.
About the Project
The Virginia Department of Transportation (VDOT) will be repaving the segment of Washington Boulevard between North McKinley Road and North Frederick Street as a part of routine repaving work in summer 2019.
As part of the repave, VDOT will remove the brick paver centerline and the brick paver crosswalks at Westover (between North McKinley Road and North Longfellow Street). Brick pavers at crosswalks and in medians are currently being phased out in Arlington County because the materials are costly to repair and require frequent maintenance.
To use the space currently occupied by the brick pavers in the median, the County is considering several restriping options, including high visibility crosswalks, bike treatments, and a limited change option. The goal is to provide better access to the Westover Library, Post Office and retail areas.
About the Process
Second Open House
Arlington County hosted a second open houseat the Westover Library on Monday, April 29, 2019. Community members were able to see final proposed striping plans, learn how community concerns were incorporated, talk with staff and understand next steps.
If you were unable to join us, please feel free to review the event materials:
Open House
Arlington County held an open house at the Westover Library on Wednesday, February 27, 2019. Community members were able to learn more, review restriping options, talk with staff and share feedback.
If you were unable to join us, please feel free to review the event materials:
Pop-Up at Westover Farmer's Market
Community engagement staff shared information about the project and feedback opportunities at the Westover Farmer's Market on Sunday, March 3 from 9:30 am to 12:30 pm. Materials shared were the same as those available at the Open House.
Online Feedback Form
An online feedback form was open for public comment from February 28 – March 31, and received over 900 responses. View a summary of the feedback received.
Funding
Funding for this project is provided entirely through VDOT's roadway maintenance program.