750 23rd Street South – Melwood Site
Location
The 1.89 acre (82,302 sf) site is located at 750 23rd Street South in the Aurora Highlands neighborhood. The site consists of Parcel A (RPC #36-039-015) and Parcel B (RPC #36-039-016). Parcel A is currently occupied by the Melwood Horticultural Training Center, which is housed in the former Nelly Custis School building originally constructed in 1923 and subsequently added to, and its associated surface parking area. Parcel B consists of a portion of Nelly Custis Park and no changes are proposed to this parcel. The site is bordered by a low-density commercial building and single-family detached houses to the west, the Church of Jesus Christ of Latter-day Saints and a low-density commercial building to the north, Calvary United Methodist Church to the east, and Nelly Custis Park to the south., Arlington, VA 22202 View Map
38.8529429,-77.05797539999999
The 1.89 acre (82,302 sf) site is located at 750 23rd Street South in the Aurora Highlands neighborhood. The site consists of Parcel A (RPC #36-039-015) and Parcel B (RPC #36-039-016). Parcel A is currently occupied by the Melwood Horticultural Training Center, which is housed in the former Nelly Custis School building originally constructed in 1923 and subsequently added to, and its associated surface parking area. Parcel B consists of a portion of Nelly Custis Park and no changes are proposed to this parcel. The site is bordered by a low-density commercial building and single-family detached houses to the west, the Church of Jesus Christ of Latter-day Saints and a low-density commercial building to the north, Calvary United Methodist Church to the east, and Nelly Custis Park to the south. ,
Arlington, VA 22202
The 1.89 acre (82,302 sf) site is located at 750 23rd Street South in the Aurora Highlands neighborhood. The site consists of Parcel A (RPC #36-039-015) and Parcel B (RPC #36-039-016). Parcel A is currently occupied by the Melwood Horticultural Training Center, which is housed in the former Nelly Custis School building originally constructed in 1923 and subsequently added to, and its associated surface parking area. Parcel B consists of a portion of Nelly Custis Park and no changes are proposed to this parcel. The site is bordered by a low-density commercial building and single-family detached houses to the west, the Church of Jesus Christ of Latter-day Saints and a low-density commercial building to the north, Calvary United Methodist Church to the east, and Nelly Custis Park to the south. ,
Arlington, VA 22202
750 23rd Street South – Melwood Site
StatusUnder Review
This reports the status related to the Site Plan Review Process only (Administrative Regulations 4.1).
About the Project
Virtual Walking Tour
Project Description
The applicant, 23rd Redevelopment Owner LLC, proposes the construction of a new 5-story mixed-use development consisting of 100% affordable housing and ground floor institutional space for educational/occupational training and support services. A partnership between the Melwood Horticultural Training Center and Wesley Housing Development Corporation, the proposal consists of 105 affordable units and approximately 18,121 sf of institutional space for workforce development and community programming services for people with disabilities. The proposal has a maximum building height of up to 60 ft (5 stories) and incorporates stepbacks on the second and fourth floors. The proposed density is approximately 154,087 sf of total gross floor area (GFA).
The site is located in the Melwood Special Land Use Study area and subject to the Melwood Special GLUP Study, accepted by the County Board in May 2024.
Applications:
- New Site Plan request for the construction of a new 5-story mixed-use development
- General Land Use Plan (GLUP) Amendment request from "Public" to “Low-Medium” Residential
- Rezoning request from “C-1” Local Commercial District and “R-6” One-Family Dwelling District to “RA8-18” Multiple-family Dwelling District
- Use Permit request to permit social service institution use for the Melwood Horticultural Training Center
Additional project details include:
- 105 affordable units
- 18,121 sf of institutional GFA
- 95 total parking spaces in a below-grade parking level
- 75 residential parking spaces
- 20 training center parking spaces
Proposed modifications for:
- Additional density
- Reduced residential parking ratio (0.71 spaces/unit)
- Density exclusions (below-grade mechanical rooms and air shafts)
Application Materials
Accepted Plan Sets [PDFs]
Public Process
Timeline
|
Milestone / Meeting
|
Materials
|
October 10, 2024
|
Site Plan Acceptance
|
|
October 21 to November 4, 2024
|
Online Engagement Opportunity
Review focus: Land Use & Density; Site Design & Layout; Building Height, Form & Architecture; Historic Preservation; Parking & Loading; Transportation; Open Space & Landscaping; Green Building & Sustainability
|
Feedback:
|
November 18, 2024
12:00 p.m. - 12:45 p.m.
In-person only
|
In-person Walking Tour
Meeting location: 750 23rd Street South
|
|
November 18, 2024
7:00 p.m. - 9:00 p.m.
In-person: Room 307 (Boardroom), 3rd floor, Bozman Government Center
or
Virtual via Microsoft Teams:
Meeting Link
Meeting ID: 290 054 044 087 Passcode: N6yXxg
Dial in by phone:
|
Site Plan Review Committee (SPRC) Meeting #1 (Hybrid)
Agenda Topics: Land Use & Density; Site Design & Layout; Building Height, Form & Architecture; Historic Preservation
|
|
December 19, 2024 (tentative) |
Site Plan Review Committee (SPRC) Meeting #2 (Hybrid)
Agenda Topics: TBD |
|
TBD
|
Planning Commission
Public Hearing
|
|
TBD
|
County Board
Public Hearing
|
|
*Process timelines are subject to change as needs arise. Check back for updates.